The Progressive Engineers & Construction Ltd.

During the last decade of twentieth century, all countries in the world faced a common historic mission of striving to create a peaceful co-operative and developing new world. Bangladesh, the largest populated developing country in the world, has taken up a new look after more than dozen years of reform and opening to outside world and is making its due contribution to world peace and global economy prosperity and development. The Progressive Engineers & Constructions Ltd. (PEC) is advancing for economical development of Bangladesh.

In the past 37 years, the PEC has provided Bangladesh with excellent and highly efficient geological and engineering technology services with its experience and strength. 57 projects have been completed by its limited resources resulting economic and social improvement of the country that are being appreciated by the people of Bangladesh. On behalf of all the staff of PEC, I would like to extend my cordial regards to our entire friends for their co-operation and assistance in procurement of contracts and implementation of projects.

On entering into the 21st century, we find this world full of challenges and opportunities which are to be faced by forming joint venture with different highly experienced national and international companies for upgrading their capacity by sharing resources. As the legal representative of the PEC, I wish to say our old and new friends that we are full of confidence to meet the demands of the times. PEC is advancing towards the goal of industrialization, conglomeration and internationalization. As always, I will keep faith, make friends extensively, co-operate sincerely and continue to provide domestic and foreign clients with quality of services quickly and on priority basis and make efforts for global prosperity abiding by contracts assign guaranteeing quality, low profits and friendship first.


Key People

Abul Hossain
Abul Hossain
B.Sc Engg. (Civil), FIEB, MBA
Managing Director
The Progressive Engineers & Construction Ltd.

 

 


  

Background

The Progressive Engineers & Construction Ltd. (PEC) was founded and registered in Joint Stock Companies, Government of the People’s Republic of Bangladesh in 1981 as a Private Ltd. Company under the Ministry of Commerce. It is a renowned specialist Private Ltd. Company with a registered Capital of BDT 1000 Million.

PEC headquarter is located at Bijoy Sharani Tower, 1st floor- A, 121/3 Tejkunipara, Tejgaon, Dhaka- 1215, Bangladesh. It has a representative office at Belta Raxit, Santosh, Upazila Tangail Sadar, District Tangail, Bangladesh. With high construction experience and advance technologies, PEC undertakes various international and domestic projects of Major Highways, Bridges, Culverts, High Rise Buildings, Factories, Embankments, Barrages, River Bank Protections, Ancillary Water and Steel Structures etc.

In addition, it provides various kinds of technological construction services, dispatches technical and engineering personnel and labour forces aboard, deals with various kinds of goods, equipment, machinery, instruments and materials needed for construction and carries out wide ranging co-operation with domestic and foreign clients in many fields.

PEC has a group of international standard high class experts, a large contingent of technical personnel and construction supervisory teams with high domestic and overseas construction supervision experiences. It also possesses advanced equipment and construction machinery and tools.

Over the last 37 years PEC has completed over 57 contracts, local and foreign aided, technological construction and co-operative projects within the country, with high quality efficiency winning high praise from related international financial institutions and the government and people of Bangladesh.

PEC is developed in business and enjoys a high reputation within the country. PEC will meet the challenge of the twenty first century with a new outlook as an industrialized and internationalized conglomerate. It will continue to work sincerely in co-operation with its old and new friends constantly in wide spheres of development, co-operation, future peace and make contributions to create a new world.


Certificate of Incorporation

incorp


GENERAL INFORMATION:

Name of Firm  :  The Progressive Engineers & Construction Ltd. (PEC)

Address  : Bijoy Sarani Tower, 1st Floor – A, 121/3, Tejkunipara, Tejgaon, Dhaka-1215, Bangladesh. Telephone: (880-2)-58151968 Cell #: 88-01315835972, 88-01642435240  E-mail: shetugroup@gmail.com

Year of Establishment  :  The Firm was established and registered in Joint Stock  Company in 1981 as Private Ltd. Firm (Certificate enclosed) Annex- 01

Status of Firm  :  ‘A’ Category Consulting Engineering Firm (Certificate enclosed) Annex- 02

Personnel Key :  Full time # 83 Part time # 06

Name of Business  :  The Firm, PEC has been engaged for the last 37 years in Quantity Surveying, Cost Estimating, Planning, Scheduling, Programming, Managing, Supervising, Monitoring, Evaluating & Reporting of different Projects in Bangladesh such as Construction of Embankments, Roads, Bridges, Culverts, Barrages, River Bank Protections and other Programming, Water Structures –  Sluice Gates, Regulators etc. High Rise Buildings & Factories such as Civil Construction, Plumbing & Sanitation, Water reticulation, Mechanical & Electrical Installations etc. and other ancillary activities.

Present Activities : The Firm, PEC has been working in Quantity Surveying, Cost Estimating, Planning, Scheduling, Programming, Managing, Supervising, Monitoring, Evaluating & Reporting of different Projects such as Construction of Embankments, Bridges, Culverts, Buildings and Accessories.


Organogram

organ


LIST OF WORKS EXECUTED BY THE PROGRESSIVE ENGINEERS & CONSTRUCTION LTD.

SI No.Name of ContractName of EmployeeValue of Works (Tk)Year of Completion
1.Construction of 2-storied office building, Residential Buildings, Workshop Complex, 2.34 km International Bituminous Roads including 3 RCC Box Culverts & Accessortes of BCDP at Baghabari Ghat, Pabna
The works comprisesof Civil construction,Plumbing
&  Sanitation,  Water         reticulation,     Electrical     & Mechanical  installations  etc.
Australian High Commission, Dhaka.3,71,85,417.001983
2.Construction of Deputy Commissioner's Bungalow, District Judge's Bungalow, D type Quarter,
2.73   km    Internal    Bituminous     Road    including Boundary Walls and Accessories at Jamalpur and Sherpur  District  Head  Quarters.
The works comprises of Civil construction,  Plumbing & Sanitation, Water reticulation, Electrical & Mechanical  installations  etc.
Project Implementation Committee, Jamalpur.4,12,34,987.001983
3.Construction of UNDP  Building  at  Dhanmondi  ; Tennis Court including Electrification, Remodeling of Annex  Building  & Ancillary  works  at Hotel Sheraton; Civil & Decoration works of lBBL at Motijheel C/A, Dhaka;   Sales                      Centre     of    Islamic    Foundation Bangladesh;         Remodeling    works     of    Australian
Recreation      Centre      at  Gulshan,       Dhaka     under Australian  High  Commission,  Dhaka.
The works comprises of Civil construction, Plumbing &   Sanitation,  Water    reticulation,     Electrical    & Mechanical installations etc ..
UNDP/BSL/IBBL/IFB
Australian High Commission,  Dhaka
3,23,75,830.001984
4.Construction  of 3 RCC Bridges  (i} 95 m Long, (ii)·79 m Long, (iii) 63 m Long, Dismantling of 1 existing steel Bailey Bridge (70 m) and 6 RCC Box Culverts of different sizes at different locations at Ghatail &
Bhuapur at Tangail on Ghatail - Sunatia & Sunatia- Bhuaour Road.
Zilla Parishad,
Tangail.
3,89,75,783.001985
5.Construction of Gazetted & Non-Gazetted officer's staff  Quarters  including   Boundary  Walls  at  Nakia, Sherpur  under  PWD,  Sherpur;  canteen, Boundary
walls Lime Terracing & Main Gate at Agrabad CIA, Chittagong; Boilder  Water  Tanks, Boundary  Walls   & Ancilllary works of BSAFIC, Joypurhat.
The works comprises of Civil construction, Plumbing
& Sanitation, Water reticulation, Electrical & Mechanical installations etc.
PWD/BHBFC/BSAFI
C, Dhaka.
3,38,75,975.001985
6.Construction of Siddeshwari Boys High  School; Sales & Exhibition centre of the Directorate of
women affairs at Eskaton Garden, Dhaka, Upazila Chairman;s Quarter at Sreebordi, Sherpur.
The works comprises of Civil construction,  Plumbing &   Sanitation,  Water       reticulation,     Electrical     &
Mechanical installations etc.
Siddeshwari School Management Committee/DWA Dhaka & Upazila Parishad, Sreebordi,
Sherpur
3,14,72,980.001986
7.Construction of (i) 65m Long RCC Bridge  over Katakhali Khal on Sreebordi-Jhagrarchar Road,  (ii) 61m  long RCC Bridge over Garkhai Khal at !anger Para on Sreebordi - Mobarakpur Road, (iii) 57m long RCC Bridge over Sailerkhal on Kurua-Kalibari Road, Dismantling of 2 existing steel Bailey Bridge (65 m to 70 m) and 6 RCC Box Culverts of different sizes at different locations at Sreebordi, SherourLGED,
Sherpur
4,78,17,329.001987
8.Construction of 4 RCC Bridges (55m, 45m, 65m & 45m Length) over Pateshwari River, Bekerhati River,
Garamara   Khal,   Sunatia   Khal, Dismantling of 1 existing steel Bailey Bridge (40 m) and   8  RCC  Box
Culverts of different sizes at different locations at
Netrokona, Sherpur and Tangail districts financed by
USAID
Directorate of Relief
& Rehabilitation, Dhaka.
6,12,73,189.001987
9.Construction  of 6  Storied JCO's  Quarter, Officer's Mess including Boundary Wa!!s and ancillary structures    such   as   3.8km    Internal   Bituminous Road at Momenshahi  Cantonment, Mymensingh. The   works    comprises            of   Civil   construction, Plumbing            &   Sanitation,       Water reticulation, Electrical & Mechanical installations etc.MES (Army), Dhaka6,17,39,912.001989
10.Construction of 117 km Bituminous roads of wearing course, 23 RCC Bridges {27m to 40 m length), Assembling of 4 steel Bailey Bridges (30m to 40m), 2 steel footover bridges (30m to 35m), 75 RCC Box culverts of different  sizes  at different locations & accessories under Third Road Rehabilitation & Maintenance Project at Rajshahi & greater Khulna Division financed by ADBLGED. Dhaka79,73,57,690.001990
11.Construction   of  11  RCC  Bridges  (30m to 53m
length), Assembling of 3 steel Bailey Bridges (35m to 45m)  & 6 RCC Box Culverts  of different  sizes at different locations of Rajshahi Division financed by US AID
Directorate of Relief &
Rehabilitation, Dhaka
23,79,75,730.001990
12.Construction    of  6   Storied   S.M   Barak,  JCO's
Quarter and Officer's Mess including Boundary walls and Ancillary structures such as 4.5km Internal Bituminous Road at Rajendrapur Cantonment  Gazipur.
 
The    works    comprises of    Civil    construction,
Plumbing    &    Sanitation,   Water     reticulation, Electrical  & Mechanical  installations  etc.
MES (Army), Dhaka7,87,92,349.001992
13.Construction of 6 Storied Shopping Cum Office Complex  with  8 storied  pilling  foundation  of M/s. Delwar  & Co. at Station  Road, Jamalpur.
 
The    works    comprises    of    Civil    construction, Plumbing & Sanitation, Water reticulation. Electrical  & Mechanical  installations  etc.
M/S. Delwar  &
Co. Jamalpur
4,79,70,530.001993
14.Rehabititationand Improvement .of Shakhipur-
Kachua, Kachua- Barochauna and Barochauna - Sagardighi Roads Project about 10 km length including 2 PSC Bridges- 48 m (3 Span)  & 60 m  (3 Span} and 8 RCC Box Culverts  of  different sizes at different locations of Shakhipur, Tangail
LGED, Tangail10,87,17,239.001994
15.Construction of 130 m long (5-Span) Post tensioning PSC bridge over river Malijhee, Dismantling of steel structures of old existing bridge (98m) & 22 RCC Box Culverts, Assembling of 2 steel Bailey Bridges (50m to 60m), 2 steel footover bridges (30m to 35m) of different sizes at different locations on Sherpur-Jhulgaon-Nalitabari road under Feeder Roads Improvement Project at Sherpur financed bv ADBFRIP, RHD,
Mymensingh
23,57,24,750.001994
16.Construction of 6 storied Super Market with 8 storied Piling Foundation  of Mis. Poddar  Bastralai & Co. at Sherpur  Town, Dist. Sherpur.
The    works    comprises    of    Civil    construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
Mis. Poddar Bastralai & Co., Sherpur6,23,70,570.001994
17.Construction of 12 storied "Cooling Tower" including workshop complex with  2  basement level on 15 storied piling foundation and internal
Bituminous  Roads of NatiQnal Highway Standard, 06km length including 06 RCC box culverts of Polash    Urea    Fertilizer    Factory    at   Ghorasal, Narsinghdhi.
The    works    comprises    of    Civil    construction, Plumbing     &    Sanitation,   Water     reticulation,
Electrical  & Mechanical  installations  etc.
BCIC, Dhaka.12,75,48,980.001995
18.Construction of 6 stoned JCO's Quarter, Office Mess including boundary walls and ancillary structures such as 5.3 km internal Bituminous Roads, and Accessories at Ghatail Cantonment, Tangail.
 
The works comprises of Civil construction, Plumbing                              & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
MES (Army), Dhaka8,23,27,439.001996
19.Rehabilitation and improvement of Nagarpur- Gaihata,   Gaihata-Jautpara & Jautpara-Khas Shahjani Roads Project about 8 km length inciuding 2 PSC Bridges- 60 m {3-Span} & 75 m (3-Span) and 8 RCC Box Culverts of different sizes at different locations of Nagarour TangailLGED, Tangail12,37,14,712.001996
20.Construction of 6 storied Residential Building with 8-stoied pilling foundation of MIS. Nurjahan & Co at 125/KA, South Pirerbagh, Mirpur, Dhaka-1216.
 
The   works   comprises     of Civil construction, Plumbing   & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
Mis. Nurjahan & Co. Dhaka.4,57,59,550.001997
21.Rehabilitation and Improvement of Rangtia -
Sandhakura & Sandhakura - Baromari Roads Project about 8 km length including 3 Pre- stressed Bridges- 48 m (3 Span), 60 m (3 Span) & 75 m {3 Span), Assembling of 2 footover bridges (60m to 70m) and RCC Box Culverts of different sizes at different locations of Jhenaigati - Nalitabari, Sherpur.
LGED, Sherpur14,98,78,312.001997
22.Rehabilitation and Improvement of Sreebordi .: Kakilakura & Kakilakura Bhalijuri Roads Project. about 10 km length including 2 PSC Bridges- 48 m (3-Span) & 60 m (3-Span),  Dismantling of 1 existing steel Bailey Bridge (50 m) and 6 RCC Box Culverts of different Sizes at different locations of Sreebordi, SherpurLGED, Sherpur17,58,77,419.001999
23.End facilities (part) of Bangabandhu Multipurpose Bridge Project at Alenga, Kalihati, Tangail of Bangladesh Bridge Authority (BBA) as Sub-Contractor of MAHL, Dhaka.
The works comprises of Civil construction such as Land Development, Bituminous Roads, Schools, Residential Buildings, Market, Overhead Tank, Footover steel bridge (70m) and ancillary works. Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
Ministry of Communication, Dhaka12,75,33,430.002000
24.Construction of 12 storied Bijoy Sarani Tower with
1 Basement level on 15 storied Mat Foundation of North South Property Development Limited at 121/3 Tejkunipara, Tejgaon, Dhaka-1215.
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
NSP Dev. Ltd., Dhaka12,22,27,830.002001
25.Rehabilitation and Improvement of Hatikumrul
Bilbashpur Road Project, Contract# 2 (Part- B), RRMP-III,  The  works  comprises  of  Repair and slope Protective works of Road from km 11.25 to km 17.75 with Earths,. Cement Concrete, Blocks GeoteXtile Fabrics and accessories
RRMP-111, RHD,
Dhaka
10,66,35,539.002002
26.Construction of 6 storied Market cum Hotel Complex with 8 storied piling foundation of M/S. Sohrab & Co. at Victoria, Road, Tangail.
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
Mis. Sohrab & Co., Tangail5,96,79,770.002003
27.Construction of 6 storied Residential Building with Piling Foundation at Palash Bari, Savar, Dhaka.
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
Mis. Mizan & Co. Savar4,17,23,750.002004
28.Rehabilitation and Improvement of Charpauli-Kakua, Kakua-Hugra, Hugra-Katuli & Katuli-Kukuria Roads Project about 12 km. Length including 3 PSC Bridges- 60 m (3-span), 75 m (5-span), Assembling 1 steel Bailey Bridge (45m) and 11 RCC Box Culverts of different sizes at different locations.LGED, Tangail19,37,75,370.002004
29Rehabilitation of Dhaka-Sylhet Road (RRMP-III), Contract # 2B from Jagadishpur Junction to Mirpur Junction in Habiganj district about 39 km. Length including 4 PSC Bridges (Post tensioning Pres-stressed Concrete Structure) 60 m (3-span), 75 m (3-span), 150 m (5-span) & 160 m (5-span), Dismantling of 4 steel structures of old/existing bridges (60m to 90m) and Assembling of 2 footover bridges (65m to 70m) and 67 RCC Box Culverts of different sizes at different locations financed by WB under CGC (China-Geo-Engineering Corporation)RRMP-III, RHD, Dhaka550,830,179.002008
30.Construction of 6-storied Residential Building with Mat Foundation of M/S. Nizam & Co. At 24/16, Tajmahal Road, Block-C, Mohammadpur, Dhaka.
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
M/S. Nizam & Co. Dhaka538,873,90.002008
31.Construction of 6-storied Residential Building with Piling Foundation of M/S. Mostafa Mohsin Mantu & Co. at Plot # 32, Road # 05, Sector # 05, Uttara Model Town, Dhaka
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
M/S. Mostafa Mohsin Mantu & Co., Dhaka579,23,730.002009
32.Construction of 10 storied residential building on Piles Foundation at Plot # 203, Road # 60, Bashundhara, Dhaka.
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
M/S. Konik & Nafi Associates Ltd. Dhaka98,917,570.002011
33.Construction of 15 storied Service Apartment building with 2-Basement level on Mat Foundation at Plot # 3, Road # 126, Gulshan-1, Dhaka.
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
M/S. Konik & Nafi Associates Ltd. Dhaka573,957,770.002013
34.Construction of 15 storied Service Apartment building with 2-Basement level on Mat Foundation at Plot # 3, Road # 126, Gulshan-1, Dhaka.
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system, IBMS – CCS, Software, BAS, PA & CCTV System etc.
M/S. Konik & Nafi Associates Ltd. Dhaka653,957,770.002013
35.End facilities (part) of Padma Multipurpose Bridge Project, contract # RS-3 at North Kumarbhog, Louhajang, Mawa, Munshiganj of BBA as Sub-Contractor of Khan & Sons, Dhaka.
 
The works comprises of Civil construction such as Land Development, Bituminous Roads, Schools, Residential Buildings, Market, Overhead Tank, 1 footover steel bridge (65m) and ancillary works. Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installation etc.
Ministry of Communication, Dhaka237,570,510.002014
36.Construction of 16 storied Service Apartment building with 2-Basement level on Mat Foundation at Plot # 4/G, Road # 104, Gulshan-2, Dhaka.
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system, IBMS – CCS, Software, BAS, PA & CCTV System etc.
M/S. Sayeed Khokan Properties Ltd., Dhaka337,980,379.002014
37.Construction of 11 storied commercial  building with 1- Basement level on Mat Foundation at 49, Johnson Road, Liaquat Avenue, Dhaka
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system, IBMS – CCS, Software, BAS, PA & CCTV System etc.
MIS. Hotel Super Ltd., Dhaka159,823,590.002015
38.Construction of 13-storied Al-Shafi Hospital with 1-
basement level on Mat Foundation at plot# 09, Road # 06, Block-A, Sector# 10, Mirpur Housing Estate, Dhaka.
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system, IBMS – CCS, Software, BAS, PA & CCTV System etc.
MIS. Al Shafi
Hospital Ltd., Dhaka
169,798,350.002015
39.Construction  of  11 storied Service Apartment building with 1-Basement level on Mat Foundation at Plot # 13, Road # 13, Baridhara, Dhaka.
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system, IBMS – CCS, Software, BAS, PA & CCTV System etc.
MIS. Sayeed Khokan Properties Ltd., Dhaka172,357,530.002016
40.Construction of 3-storied Residential Bungalow, single storied Madrasha Bhaban with 3-storied foundation; Bhadrapukur & Khan Jahan Ali Jam-e-Mosque with 3 storied foundation at Paigram Kasba, Phultala, Khulna and 2 storied Monwara Kadir Jam-e-Mosque with 3-storied foundation at Kalsi, Bagharpara, Jessore.
 
The works comprises of Civil construction, Plumbing & Sanitation, Water reticulation, Electrical & Mechanical installations etc.
M/S. Konik & Nafi Associates Ltd. Dhaka125,725,930.002017
41.Construction of 13 storied residential building with 1 basement level on Piles Foundation at Akurtakurpara, Tangail, Bangladesh.
 
The works comprises of Civil construction, PHE - Plumbing, Sanitation & Water reticulation etc., Electrical & Mechanical Installations such as Façade System (Aluminum – Glass), HVAC (Air Conditioning), Lift (Vertical Transport), Generator, High Voltage Electrical Works: Sub-Station – Transformer, HT & LT panel, Bus Bar, LT Cables; Low Voltage Electrical Works; Fire detection, Alarm and protection system etc.
M/S. Karim & Associates, Tangail233,875,957.002018
42.Road Rehabilitation and Maintenance of works of Dhaka Mass Rapid Transit Development Project (DMRTDP), CP – 03 & 04, MRT Line – 06, Uttara to Agargaon section under Italian – Thai Development Public Company Ltd. and CP – 06, MRT Line-06, Karwan Bazar to Motijheel section under SMCC – ITD JV as sub-contractor.
 
The works comprises of Roadway Excavation, Improved subgrade, sub-base course, Base course, Bituminous Binder course & Wearing course, 2 storied steel structures with 2 steel foot stairs etc.
Italian – Thai Development Public Company Ltd. & SMCC – ITD JV.175,000,000.002019